Case study

Katy Business District Detention Pond

Design-to-finish excavation and shaping of a 2.4-acre stormwater detention pond for a commercial development in Fort Bend County. Engineered slopes, inlet/outlet coordination, and finish grading to civil drawings.

Location
Katy, TX
Service
Detention Pond
Scale
2.4 acres
Duration
7 weeks
The Scope

Project Overview

A commercial development in Fort Bend County required a 2.4-acre stormwater detention pond built to the district's volumetric and slope standards before vertical permits would be released.

Stone River executed the excavation, shaped the engineered side slopes, coordinated inlet and outlet structure placement with the civil engineer, and finish graded the basin to the civil drawings.

The basin passed district inspection on the first submission.

Scope Detail

What the Work Involved

  • Bulk excavation of the 2.4-acre basin to design volume
  • Engineered side slope cutting and finishing
  • Inlet and outlet structure coordination with the civil engineer
  • Clay liner preparation and compaction
  • Finish grading to civil drawings and as-built documentation
Project Challenges

What Made This Job Hard

1. Slope Tolerance

District standards left little room for error on side slope ratios. GPS machine control held the slopes to design, verified by survey shots at each stage.

2. Groundwater Management

Excavation below the seasonal water table required staged dewatering so shaping and liner work could proceed on stable material.

Results

How It Finished

All detention grades were accepted on first inspection and the developer's vertical permits released on schedule.

Request a Bid

Project Gallery

Katy Business District Detention Pond — site photo 1 Katy Business District Detention Pond — site photo 2 Katy Business District Detention Pond — site photo 3 Katy Business District Detention Pond — site photo 4

More Projects

Westpark Industrial Pad Site
Pad Site Development Houston, TX

Westpark Industrial Pad Site

Full-scope site preparation for a 14-acre industrial facility in west Houston. Scope included mass excavation, cut-and-fill earthwork, GPS-controlled finish grading, and stormwater detention integration. Delivered on schedule for general contractor handoff.

Read case study
Cypress Creek Commerce Park
Commercial Land Clearing Harris County, TX

Cypress Creek Commerce Park

Heavy land clearing across 22 acres of mixed brush, timber, and stumps for a multi-tenant commercial park. Site cleared, debris removed, and rough grade established for GC mobilization.

Read case study
View All Projects
Request a Bid

Ready to Request a Bid on Your Commercial Site Work?

Tell us about your project and we will get back to you within two business days. No obligation, no sales pressure. Just a straight conversation about whether Stone River is the right fit for your job.