Call Us: 713-581-9345
Case study

Conroe Medical Campus Site Prep

Site preparation and precision grading for a 6-acre medical office campus. Scope included topsoil stripping, subgrade preparation, and GPS-verified finish grading to within design tolerance.

Location
Montgomery County, TX
Service
Site Preparation and Grading
Scale
6 acres
Duration
9 weeks
The Scope

Project Overview

A 6-acre medical office campus in Montgomery County required precision site preparation with tight grading tolerances across building pads, drives, and parking fields.

Stone River stripped topsoil, prepared the subgrade to the geotechnical specification, and executed GPS-verified finish grading to within design tolerance across the full campus.

The site was handed to the general contractor with complete compaction and grade documentation.

Scope Detail

What the Work Involved

  • Topsoil stripping and stockpile management
  • Subgrade preparation to geotechnical specification
  • GPS-verified finish grading across pads, drives, and parking
  • Compaction testing coordination at engineer-specified locations
  • As-built grade reporting to the engineer of record
Project Challenges

What Made This Job Hard

1. Multiple Grade Planes

Building pads, ADA-compliant drives, and parking fields each carried different tolerance requirements. GPS models were built per plane and verified independently.

2. Active Adjacent Facility

An operating clinic bordered the site. Dust control, haul routing, and working hours were managed to keep the neighbor operational throughout.

Results

How It Finished

Finish grades were verified within design tolerance across the full campus and the project moved to foundations without rework.

Request a Bid

Project Gallery

Conroe Medical Campus Site Prep — site photo 1 Conroe Medical Campus Site Prep — site photo 2 Conroe Medical Campus Site Prep — site photo 3 Conroe Medical Campus Site Prep — site photo 4

More Projects

Westpark Industrial Pad Site
Pad Site Development Houston, TX

Westpark Industrial Pad Site

Full-scope site preparation for a 14-acre industrial facility in west Houston. Scope included mass excavation, cut-and-fill earthwork, GPS-controlled finish grading, and stormwater detention integration. Delivered on schedule for general contractor handoff.

Read case study
Cypress Creek Commerce Park
Commercial Land Clearing Harris County, TX

Cypress Creek Commerce Park

Heavy land clearing across 22 acres of mixed brush, timber, and stumps for a multi-tenant commercial park. Site cleared, debris removed, and rough grade established for GC mobilization.

Read case study
View All Projects
Request a Bid

Ready to Request a Bid on Your Commercial Site Work?

Tell us about your project and we will get back to you within two business days. No obligation, no sales pressure. Just a straight conversation about whether Stone River is the right fit for your job.