Cypress Creek Commerce Park
Heavy land clearing across 22 acres of mixed brush, timber, and stumps for a multi-tenant commercial park. Site cleared, debris removed, and rough grade established for GC mobilization.
Full-scope site preparation for a 14-acre industrial facility in west Houston. Scope included mass excavation, cut-and-fill earthwork, GPS-controlled finish grading, and stormwater detention integration. Delivered on schedule for general contractor handoff.
Westpark is a 14-acre industrial facility site in west Houston developed for a logistics tenant on a fixed delivery schedule. The earthwork scope covered the full site, from raw ground to a construction-ready pad.
Stone River was contracted for mass excavation, cut-and-fill earthwork balanced on-site, GPS-controlled finish grading, and integration of the site's stormwater detention into the grading plan.
The pad was delivered on schedule for general contractor handoff, with compaction documentation submitted to the engineer of record at each hold point.
The logistics tenant's lease start date fixed the handoff window before earthwork began. Stone River sequenced the pad ahead of the paving areas so vertical construction could mobilize while site grading finished.
Hauling import or export through west Houston traffic would have consumed the schedule margin. The grading plan was executed to balance material on-site, eliminating truck cycles and keeping the operation inside the fence.
The pad was turned over on schedule and passed compaction verification at every tested location on the first submission. The general contractor mobilized vertical construction without a single earthwork-related delay.
Heavy land clearing across 22 acres of mixed brush, timber, and stumps for a multi-tenant commercial park. Site cleared, debris removed, and rough grade established for GC mobilization.
Design-to-finish excavation and shaping of a 2.4-acre stormwater detention pond for a commercial development in Fort Bend County. Engineered slopes, inlet/outlet coordination, and finish grading to civil drawings.