Call Us: 713-581-9345
Case study

Cypress Creek Commerce Park

Heavy land clearing across 22 acres of mixed brush, timber, and stumps for a multi-tenant commercial park. Site cleared, debris removed, and rough grade established for GC mobilization.

Location
Harris County, TX
Service
Commercial Land Clearing
Scale
22 acres
Duration
6 weeks
The Scope

Project Overview

Cypress Creek Commerce Park is a multi-tenant commercial development on 22 acres of previously undeveloped Harris County land carrying mixed brush, mature timber, and old-growth stumps.

Stone River was contracted to clear and grub the full tract, remove and dispose of all debris, and establish rough grade so the general contractor could mobilize.

Clearing was completed ahead of schedule with all disposal handled off-site in compliance with county requirements.

Scope Detail

What the Work Involved

  • Heavy clearing of 22 acres of mixed brush and timber
  • Grubbing of stumps and root systems across the full tract
  • Off-site hauling and compliant disposal of all cleared debris
  • Erosion control installation ahead of ground disturbance
  • Rough grading to establish GC mobilization surface
Project Challenges

What Made This Job Hard

1. Mixed Vegetation Density

The tract ranged from light scrub to dense stands of mature timber. Stone River staged the clearing fleet by zone so mulching, felling, and hauling could run in parallel instead of sequentially.

2. Wet-Season Access

Rain during the clearing window threatened haul-out cycles. Temporary haul roads and sequenced work fronts kept trucks moving without cutting up the subgrade.

Results

How It Finished

The site was cleared, grubbed, and rough graded ahead of the contracted window, and the general contractor mobilized directly onto a clean, stable site.

Request a Bid

Project Gallery

Cypress Creek Commerce Park — site photo 1 Cypress Creek Commerce Park — site photo 2 Cypress Creek Commerce Park — site photo 3 Cypress Creek Commerce Park — site photo 4

More Projects

Westpark Industrial Pad Site
Pad Site Development Houston, TX

Westpark Industrial Pad Site

Full-scope site preparation for a 14-acre industrial facility in west Houston. Scope included mass excavation, cut-and-fill earthwork, GPS-controlled finish grading, and stormwater detention integration. Delivered on schedule for general contractor handoff.

Read case study
Katy Business District Detention Pond
Detention Pond Katy, TX

Katy Business District Detention Pond

Design-to-finish excavation and shaping of a 2.4-acre stormwater detention pond for a commercial development in Fort Bend County. Engineered slopes, inlet/outlet coordination, and finish grading to civil drawings.

Read case study
View All Projects
Request a Bid

Ready to Request a Bid on Your Commercial Site Work?

Tell us about your project and we will get back to you within two business days. No obligation, no sales pressure. Just a straight conversation about whether Stone River is the right fit for your job.